The painting has taken WAY longer than either the general contractor or we expected, but the results are showing. The painter-subcontractors appear to have skim coated the entire apartment (this despite skim coating being outside the scope of the project, although for what we're paying, it could've been).
Now that we're six days away (T-6) from moving back in, I am astounded at the number of aesthetic details that we've had to address. Switch plates - pure white or berber white? Closet door latches - ball bearing or mirror? Bathroom moulding - accent line on the inside or the outside? Mounting your plasma on the living room wall - HDMI, component cable or S-video?
All I can say is, I'll be thrilled once we settle back in next weekend.